Solar Tube / Attic Fan

SUBMITTAL REQUIREMENTS

  • Dollar Value of solar tube/attic fan and placement location.

PERMIT PROCESS

  • Apply online at  www.mgoconnect.org
  • Select Solar tube in drop down box when applying. If you are installing an electric attic fan, please have your electrician apply for an electrical permit or for homeowners, a homeowners exemption form is to be filled our prior to the issuance of the electrical permit.
  • Pay Permit Fee 
  • Application submittal process is complete, project # is assigned.
  • Notification of approval will be sent via e-mail from noreply@scpdc.org .
  • Request required inspections – All inspections must be requested at www.mgoconnect.org  by 3:00pm for the next business day.

REQUIRED INSPECTIONS

1. Solar Tube/Attic Fan Inspection – Look at roof, to make sure shingles have been overlapped correctly. Look in attic to ensure that no truss was cut by installation. No visible water intrusion/leak, visible ceiling installation

Approved permits are valid for six (6) months from date of issuance. If no inspection activity has taken place within the six (6) months, application and renewal fees for resubmittal is required. In order to close permit, all inspections must be completed. Permits are not required to be posted at project address. Inspector must have access to property at time of requested inspection. If no access, re-inspection fee may apply.

Quick Links

Interactive Maps

Swimming Pool / Spa

A permit is required for installation of in-ground, or prefabricated swimming pools that are greater than 24 inches deep, spas or hot tubs, in either commercial or residential use.

Current Adopted Code: 2015 Swim Pool and Spa

You can apply online at www.mygovernmentonline.org


 Required Documentation:


Swimming Pool Process:

  1. Submit application along with required documentation as listed above online at www.mygovernmentonline.org
  2. Pay fee once application is accepted and you receive notification
  3. Allow ten business days for review
  4. Permit is approved
  5. Electrician requests electrical permit under main permit#/Plumber requests plumbing permit under main permit#
  6. Layout Inspection
  7. Pool Steel and Plumbing Rough
  8. Deck Bond and Deck Steel
  9. Swimming Pool Final

Are there any special requirements?

Impervious Cover

  • 50% of the square footage of the water surface area of a residential swimming pool shall be counted as a pervious surface.  This does not include the apron of the pool, surrounding patio, or decking, all of which will count towards the impervious cover.
  • Impervious cover limitations are established on the approved recorded plat. In the event, the recorded plat does not establish the impervious cover limitations the maximum impervious cover allowed shall be determined in accordance with the Unified Development Code Chapter 11.
  • Click Here for link to Williamson County Clerk Public Records Search for subdivision plats.

Adopted Code: 2015 Swim and Spa Code

  • A fence, wall or barrier is required that completely surrounds the swimming pool, tract, or lot. Barrier requirements are intended to provide against potential drowning and near drowning by restricting access to swimming pools, spas and hot tubs.
  • All doors with direct access to the pool shall be equipped with an alarm which produces an audible alarm when the door is opened.

Additional Information:  

Is a pool permit required in the ETJ or County? 

No. A swimming pool permit is only required inside the City Limits of Georgetown

A plumbing permit is required if the pool has an autofill device within the etj.

Is a Permit required for an above the ground pool? 

Prefabricated swimming pools that are less than 24 inches (610 mm) deep do not require a permit.

Can a swimming pool be located within a setback? 

Per section 6.04.020 C 7 of the Unified Development Code, a residential swimming pool can be located entirely within the side and/or rear yard but must be set back at least three feet from side and rear property lines.

Can a swimming pool be located within a PUE or Easement? 

No

How do I know if the address is inside or outside the City Limits of Georgetown?

Visit our interactive maps page to figure out if the address is inside the City Limits of Georgetown

What is an official property survey? 

A property survey is a drawn record of the boundaries, orientation and easements associated with a lot of land.

What does an official property survey look like?

Click here for an example of a property survey

Where can I locate a copy of my property survey?

A survey is typically provided when you purchase a home and you should have been given a copy at your closing. Check with your closing documents and see if there is a copy in the paperwork and you already have it. If not contact the title company or your realtor. They should be able to either pull it from their files, or get it from the survey company for you.

Does the City of Georgetown have a copy of my survey?

The City does not maintain property surveys, but you may be able to get one through the title company, bank, or the survey company.

Does the Williamson County Clerk have a copy of my survey? 

No, the Williamson County Clerk’s office does not have copies of your property survey.

What is a plat?

A plat is the official map of an addition or subdivision, showing the number and dimensions of lots, public rights-of-way, and easements. The plat must be filed with the County Clerk after the City has approved it.

What is the difference between a plat and a property survey?

plat usually shows the dimensions of the property before the improvements are made. A plat will often cover more than one lot or parcel of land. For example, a developer will have a plat of an entire subdivision drawn; A survey usually only shows one lot.

Does the Williamson County Clerk have copies of subdivision plats? 

Yes, the Williamson County Clerk’s office does keep copies of the subdivision plats.

How do I search online for a copy of a subdivision plat? 

Please click here for directions to search for a subdivision plat

Does the Williamson County Appraisal District have a copy of my property survey? 

No, the Williamson County Appraisal District does not have copies of property surveys.

What is Impervious Cover? 

Per Chapter 16 of the Unified Development Code: Impervious Cover – Any hard-surfaced, man-made area that does not readily absorb or retain water, including, but not limited to, building roofs, parking and driveway areas, pavement, graveled areas, sidewalks, and paved recreation areas. Impervious Cover is subject to the determination of the Development Engineer. Includes and may be referred to as the term “Impervious Surface”.

Why is there Impervious Cover Limitations? 

Per Chapter 11 of the Unified Development Code : Impervious cover limitations are adopted to minimize negative flooding effects from stormwater runoff and to control, minimize, and abate water pollution resulting from urban runoff of rainwater or other non-point specific sources, pursuant to Texas Water Code § 26.177

Is there a variance to Impervious Cover Limitations?

Only in unique circumstances.

Impervious cover limitations may be established when a property is subdivided (Subdivision Plat). In this case, a restriction is added to the Plat detailing the maximum impervious cover for the subdivision and per lot. If your Plat identifies the maximum impervious cover allowed, a variance may not be granted.

If no impervious cover limitation is established by the Plat, a variance may be requested only for non-residential property over 5 acres.

Where can I find more information on Impervious Cover Limitations?

 For more information on Impervious Cover Limitations, please visit Chapter 11 of the Unified Development Code

Is my address in the city limits?

Photovoltaic Systems

Important Information Regarding Photovoltaic/ Solar Applications : 

Effective October 1, 2021, City of Georgetown  will resume accepting Solar Interconnection Applications on a new portal. This new portal will allow a more streamlined process for submitting a Distributed Energy Resource (DER*) Interconnection Application.

All information regarding photovoltaic/ solar, backup generation, or any DER interconnection can be found at the new DER page.

The new Interconnection Portal can be accessed here.

*DER systems include: Roof Top Solar Photovoltaic Units, Residential Battery Storage, etc.

New Distributed Energy Resource (DER*) Installation and Interconnection Policy

On June 22, 2021, the City Council approved the new DER Installation and Interconnection Policy. The new policy will be effective as of October 1, 2021.  The approved fee schedule is shown below:

Fee Description* Amount
DER installation and interconnection Application Fee $250
Facilities Study* * $1,000
DER Installation and Inspection Fee $450
Additional Inspection Fee** $150

 *All fees identified as non-refundable. **As needed.

If you have any questions, please contact: interconnection@georgetown.org

Permitting Process:

A Photovoltaic Permit is required for any Photovoltaic Installation within the city limits of Georgetown or any where the City of Georgetown is the electrical provider.

If Oncor/PEC is the electric provider apply online atwww.mgoconnect.org

If City of Georgetown is the electric provider -Visit the DER page or The new Interconnection Portal can be accessed here.

Additional Links and Information:

Oncor interconnection requirements

Pedernales interconnection requirements

 

 

 

.

 

 

 

Patios / Decks / Flatwork

SUBMITTAL REQUIREMENTS

  • Complete Residential Miscellaneous Application online at www.mgoconnect.org
  • Official Site Survey indicating the property lines and proposed patio, deck & flat work location with dimensions and construction drawings to include footing details if raised masonry (12” footing required for seat walls, etc…).
  • Please show impervious Cover Calculations on survey site plan and/or impervious cover calculation worksheet. Click here for more info on impervious cover

PERMIT PROCESS

  • Apply online at  www.mgoconnect.org
  • Select Deck, arbor, patio, patio cover in drop down box when applying.
  • Pay Permit Fee when notification is sent.
  • Application submittal process is complete, project # is assigned.
  • Allow fifteen to twenty business days for plan review.
  • Notification will be sent via e-mail from noreply@scpdc.org .
  • Pay balance.
  • Start construction.
  • Request required inspections – All inspections must be requested at  www.mgoconnect.org  by 3:00pm for the next business day

REQUIRED INSPECTIONS

  1. Foundation /Pre-pour Inspection – Proper dowel rods and spacing, proper mesh or steel installed, proper width and slope, expansion material and spacing
  2. Set Back Inspection-Locate and Expose the Property Iron Pins and install a string line to form an outline of where patio is to be constructed/placed on property. If existing property pins cannot be located, the property boundary must be established by measurement from existing benchmarks or by placement of new property marks through a registered survey.**
  3. Building Final Inspection – Property Iron Pins shall be left exposed for final inspection.

**The Owner/Contractor is responsible to properly locate the property lines; locate pins on survey, and assuring that the work is completed in compliance with applicable codes and ordinances. *Engineer stamped plans may be required if deck height is over 6’.

*If electrical or plumbing is part of project, additional permitting and inspections may apply.

Impervious Cover FAQ: Click here 

Additional information needed specific to your project?

Click here to submit an inquiry specific to your project

General Permitting Questions:

For any questions, please contact permits@georgetown.org

Patio Cover

Required Inspections:

  1.  Foundation /Prepour Inspection – Proper dowel rods and spacing, proper mesh or steel installed, proper width and slope, expansion material and spacing
  2.  Set Back Inspection-Locate and Expose the Property Iron Pins and install a string line to form an outline of where patio is to be constructed/placed on property. If existing property pins cannot be located, the property boundary must be established by measurement from existing benchmarks or by placement of new property marks through a registered survey.**
  3.  Building Final Inspection – Property Iron Pins shall be left exposed for final inspection.

*If electrical is part of project, additional permitting and inspections may apply.

**The Owner/Contractor is responsible to properly locate the property lines; locate pins on survey, and assuring that the work is completed in compliance with applicable codes and ordinances.

Submittal Requirements

  • Complete Application online at www.mygovernmentonline.org
  • Official Site Survey indicating the property lines and proposed Patio Cover, Pergola, Arbor location with dimensions and construction drawings.

Permit Process

  • Apply online at  www.mgoconnect.org
  • Select Deck, Arbor, Patio, Patio Cover in drop down box when applying.
  • Pay Permit Fee when notification is received.
  • Application submittal process is complete, project # is assigned.
  • Allow ten (10) business days for plan review.
  • Notification will be sent via e-mail from noreply@scpdc.org .
  • Pay Permit Fees.
  • Start construction.
  • Request required inspections – All inspections must be requested online at  www.mgoconnect.org by 3:00pm for the next business day

Additional information needed specific to your project?

Click here to submit an inquiry specific to your project

General Permitting Questions:

For any questions, please contact permits@georgetown.org

Irrigation Systems

An Irrigation Permit is required before you install any lawn irrigation system which you permanently connect to the City’s water supply.

A lawn sprinkler permit is not required when making repairs to the piping of an existing lawn irrigation system unless the back-flow prevention device is being replaced.

After the system has been installed and completed. A state certified back flow prevention tester must test the back flow device and a cross connection test report  must be completed at www.vepollc.com . The backflow report  must be completed at www. vepollc.com within 72 hours of test completion and the inspection to notify the city the back flow test report was completed must be requested via www.mgoconnect.org

Click here for Backflow Prevention Testing Info

Where to apply:

Apply online at  www.mgoconnect.org  for a lawn sprinkler permit, select  irrigation application  and upload the irrigation plan that is sealed/stamped /signed by a Licensed Irrigator and as built plans if the irrigation system includes a new water service/water meter.

Water Meter Needed: Additional requirements may required if installing a new water tap.

Fee Schedule: Click here for fee schedule 

Contractors: All contractor must be registered. Click here to register.  

As a homeowner can pull my own permits?

A Homestead Exemption permit may be issued to non-licensed individuals to perform plumbing, electrical and mechanical work within the dwelling premises that they own and occupy. Before beginning any work, the unlicensed person must first sign an affidavit stating that the applicant owns and occupies the structure and is responsible for conducting the work to code specifications, provide proof of ownership from Williamson County Appraisal District and pay all required permit fees. Homeowner exemptions do not apply to rental or commercial properties.

Homeowners Exempt Certificate

TCEQ Landscape Irrigation information: https://www.tceq.texas.gov/drinkingwater/irrigation

For additional questions, please contact  permits@georgetown.org

 

Fences

A Fence Permit is required to erect a new fence on a property located within our City limits, with the exception of agricultural uses, as well as pet or livestock, garden, or similar fencing provided the fence is in a property that has a perimeter fence. Required permits must be obtained prior to initiating any work.

For minor alterations to an existing fence, such as replacements of pickets, panels, posts or other materials, a permit is only required if the changes exceed one third (1/3) of the facing of the existing fence. Any vertical or linear addition or the relocation of an existing fence requires a new permit. Please note that all fences must be kept in good repair and in a safe and attractive condition, consistent with the design established with the Fence Permit.

Below is a list of questions to assist you in obtaining a Fence Permit:

Q: Where do I apply for a fence permit?

A:  Apply online with all required supporting documents at www.mygovernmentonline.org

Supporting documents include:

  • A copy of the survey of the property identifying the location, height and material of the proposed fence.
  • Pay Application fee. (We will send a notification to pay once accepted for review) .   Click here for current fee schedule

For a quick walk through of how to use MyGovernmentOnline, click here.

Q: How much does a fence permit cost?

A:  The current fee to apply for a fence permit is listed on fee schedule. Please note that this fee may be subject to change.

Q: Must a fence be designed by an engineer?

A:  Masonry, stone, rock and brick walls that are eight (8) feet or taller and pre-engineered walls/products require fence details signed and sealed by an engineer. Please note that retaining walls that are over three (3) feet in height must be designed by an Engineer.

      For all fences, plans and details must be legible, include all pertinent information (i.e. height, length, material, etc.), and preferably drawn to a 1/4-inch or 1/8-inch scale.

Q: How much time does it take to process a fence permit?

A:  Currently, the City strives to process all fence permits within  10 business days from receipt of a complete application. This time may be extended if a License to Encroach is required for the proposed fence. To help expedite your review, please ensure that all required documents and plans are submitted with the permit application in compliance with local codes and this Customer Bulletin.

Q: Will the fence be inspected once complete?

A:  Yes. All new fences, to include replacement of existing fences, will be inspected after permit is issued. Inspections may be scheduled online at www.mgoconnect.org.

Q: Are there limitations to the type of materials that may be used to construct a fence?

A:  Fences may be made of wood, stone, rock, concrete block, masonry brick, brick, decorative wrought iron, chain link, welded wire, or other similar material. Prohibited materials include plywood, paper, plastic, fiberglass panels, chicken wire, fabric, or sheet, roll or corrugated metals. The finished “face” side of the fence (opposite the structural supports) must face all public streets and public parkland.

However, please note there are additional fence requirements for certain types of uses. These standards are detailed in Section 8.07 of the UDC. In addition:

  1. Fences within the front yard must be 50% opened (i.e. wrought iron or picket fence).
  2. For -residential uses, barbed wire fences are not allowed on lots of less than 2 acres.
  3. For apartment complexes, only wrought iron or similar material is allowed in the front and side setbacks when abutting a local or collector street; wood fences may be allowed within the setbacks that abut another property.
  4. Swimming pools require a fence/barrier surrounding the pool with a self-latching gate in accordance with the 2000 International Residential Code (“IRC”). Please refer to Appendix G of the IRC for swimming pool standards.

All fences must be constructed to perpetually maintain structural integrity against natural forces such as wind, rain and temperature variations. Fences constructed of chain link, welded wire, picket or similar materials shall require a minimum of two (2) support rails spaced at least one half (½) of the total height of the fence apart.

In addition, we highly encourage you to check with your Home Owner’s Association for additional restrictions or requirements that may be applicable to you.

Q: Are there height limitations for building a fence?

A:  In accordance with Section 8.07 of the UDC, fences may be built to the heights shown in the table below. Fence height is to be measured from the ground level on the higher side of the fence or wall.

  Single-family, two-family and townhome Apartment Complex Non-residential
Front Yard 4 ft max; 50% opened 6 ft max 4 ft max; 50% opened
Side Setback 6 ft max; however,4 ft max if abutting a local or collector street;5 ft max if abutting an alley 8 ft max; however,6 ft max if abutting a local or collector street 8 ft max; however,4 ft max if abutting a local or collector street
Rear Setback 6 ft max; however,5 ft max if abutting an alley10-ft setback required if abutting a local or collector street 8 ft max 8 ft max

Please note that certain uses have specific or additional standards. These standards are detailed in Section 8.07 of the UDC. In addition, fences in the side and rear setbacks of single-family, two-family and townhome residential uses may be increased to 8 feet in height under certain circumstances as specified in Section 8.07.040(B)(4) of the UDC and the Residential Fence UDC Interpretation dated June 21, 2013 (https://udc.georgetown.org, Chapter 8). For industrial and utility uses, barbed wire may be used above any conventional 6-foot fence provided the total height does not exceed 8 feet.

Q: Are there exceptions to the materials or height limitations?

A:  Alternative fence materials, location and height may be considered by the Planning Director through the City’s Administrative Exception process. Section 8.07.080 of the UDC details the justifiable reasons for requesting an exception.  Click here for Administrative Exception information 

Please note that Administrative Exceptions must be approved prior to applying for a fence permit. In this event, a copy of the approved Administrative Exception must be included with the fence permit application.

Q: How do I know which side is the front of my property?

A:  For corner or multi-frontage lot, the front is determined by the shortest street frontage of the lot. Where the lot is relatively square or unusually shaped, a request may be made to the Planning Director for a determination.

Q: My fence will be built on a corner lot. Does this make a difference?

A:  In accordance with the “Sight Triangle” requirements in Section 12.03.050 of the UDC, no fence or wall more than 25% solid or more than 3 feet tall shall be located within 25 feet of the right-of-way at the intersection of two streets or within 8 feet of the intersection of a street and an alley.

Q: There is an easement on my property. Can I build my fence over or across the easement?

A:  Walls or other fencing proposed to be located near a public utility easement, or buried or above-ground utility equipment that are made up of masonry or a similar product and containing a poured foundation shall require review by the Development Engineer prior to approval. A License to Encroach pursuant to Section 3.21 may also be required.

For non-residential uses, fences within a required setback adjacent to a public right-of-way may not be located in a public or landscape easement.

Fences may not be located within a drainage easement or floodway area. Fences proposed within the 100 year Flood Plain will require approval of a Flood Plain Development Permit.

For additional information, please email the Inspections Department at  permits@georgetown.org.

Q: May I remove a tree that will interfere with the construction of the fence?

A:  Residential subdivisions that were platted prior to February 13, 2007, may remove trees without obtaining further approval from the City.

Residential subdivisions platted after February 13, 2007, and all other properties may not be clear-cut or selectively cleared, or have a Protected or Heritage Tree removed, without first obtaining the necessary approvals from the City.  To read more about heritage trees, please visit Chapter 8 of the UDC

Q: May I place a sign on the fence?

A:  All messages or advertising on fences or walls are considered signage and thus are not allowed on fences unless permitted in accordance with Chapter 10, Sign Standards, of the UDC.

Q: Are there any other permits required for a fence?

A:  Fences that do not meet applicable guidelines/requirements located in downtown or old town overlay will require a COA and HARC’s approval.

      Walls or other fencing proposed to be located near a public utility easement or buried or above-ground utility equipment that are made up of masonry or a similar product and containing a poured foundation may require a License to Encroach pursuant to Section 3.21. Click here for License to Encroach information 

Q: May I build a temporary fence?

A:  Temporary fences are permitted subject to the issuance of a Fence Permit. However, temporary fences for a site with an active Building Permit, Storm water Permit, or part of a roadway construction project are allowed without a Fence Permit. This type of temporary fence must be removed at the expiration of such Permit or the conclusion of construction, whichever occurs first.

Q: May I build an electric fence?

Q:  May I build an electric fence?

A:  Electric fences are allowed subject to the following:

1.   Electric fences must be placed within a minimum of 10 feet from any public rights-of-way or sidewalk;

2.   Electric fences must be placed a minimum of two (2) feet from all private property lines.

3.   A “Warning: Electric Fence in Operation” sign at least 12 inches x 12 inches in size must be posted at intervals of not more than 50 feet apart and located not more than 1 foot away from the fence.

Q: Are there additional reviews required for a fence?

A:  All fencing that will cause a diversion of water runoff or otherwise prevent the natural flow of storm water shall require review by the Development Engineer prior to approval.

      Walls or other fencing proposed to be located near a public utility easement, or buried or above-ground utility equipment that are made up of masonry or a similar product and containing a poured foundation shall require review by the Development Engineer prior to approval. Additionally, a License to Encroach pursuant to Section 3.21 of the UDC may be required.

Fences proposed within the 100 year Flood Plain require the review and approval of a Flood Plain Development Permit.

Q: Are there any other requirements for a fence?

A:  All fences and fencing locations shall be in compliance with the requirements of the adopted Building Code, Fire Code, or any other health and safety provision adopted by the City of Georgetown. In the event that a Building Code or Fire Code requirement supersedes any provision of the UDC or would make such provision unworkable, those codes shall govern.

Additionally, Chapter 5 of the UDC contains provisions for fencing materials, heights, and locations associated with particular uses that are allowed with additional requirements in certain zoning districts. Below are references to each such provision with the corresponding section number:

A.  Day Care – UDC Section 5.030.020.B

B.   Bed and Breakfast – UDC Section 5.04.020.A and B

C.  Offices in the RS District – UDC Section 5.04.020.J

D.  Self-storage – UDC Section 5.04.020.P

E.   Fuel sales – UDC Section 5.04.020.S

F.   Intermediate Utility Services – UDC Section 5.05.020.B

G.  Outdoor Storage, Limited – UDC Section 5.09.030.B

H.  Outdoor Storage, General – UDC Section 5.09.030.C

Additional information needed specific to your project?

Click here to submit an inquiry specific to your project

 

 

Accessory Building (Storage Building/Garage/Carport)

Per Chapter 6, section 6.06 of the Unified Development Code, a permit is required for an Accessory Building (Storage Building, Garages, & Carports) within the City Limits of Georgetown. The following requirements must be met except as specified:

  • Accessory structures and buildings (Storage Building, Garages, & Carports) shall meet the dimensional standards of the base zoning district, except as specified in this Section of the UDC.
  • The accessory structure shall only be located on a lot with a principal structure, unless two adjacent lots have common ownership, in which case the structures may be located on different lots. In such instance, the accessory structure shall be located in the rear yard as determined by the lot with the principal structure on it.
  • The square footage of an accessory structure shall not exceed 25% of the square footage of the principal structure. For the purposes of this calculation, the square footage of a garage shall not be considered part of the principal structure.
  •  Accessory structures measuring 8 feet or less in height are allowed in the setbacks in the rear yard up to 3) feet from the property line, but may not extend into any P.U.E. Properties in the Old Town Overlay District must follow the procedures outlined in Section 4.09.040, Special Exception for Setback Modification and the approval process pursuant to Section 3.15.
  • Garages and carports, whether attached or detached from the principal structure, shall be set back a minimum of 25 feet from property line street from which the associated driveway takes access or a minimum of 10 feet when taking access from a public alley.
  • No more than 30% of the rear yard may be covered with accessory buildings or structures. All impervious cover requirements in Section 11.02 shall be met.
  • Accessory dwelling units located in accessory structures in the AG, RE, RL, and RS Districts are allowed subject to the limitations provided for in Section 5.02.020.B or within a Housing Diversity Development without limitations (as detailed in Section 6.07.020).
  • Per Code of Ordinances  Sec. 15.03.110. – Section 401.1.2  All foundations shall be designed and constructed in accordance with engineering practices and within the scope of this code. Upon completion of the foundation construction or concrete application an engineer’s certification shall be required for inspection purposes. The certification shall contain no opinions or disclaimers and shall provide that the foundation was inspected and meets the engineered design, live and dead loading, and soil condition per requirements of the 2015 International Residential Building Code.” Exception: This shall not apply to accessory structures less than 200 square feet and are considered as portable on skids.
  • If the address is located in the downtown or old town overlay – a Certificate of Appropriateness may be required.

How to apply for an Accessory Building Permit

Submittal Requirements for Storage Building/Garage/Carport:

  • Completed application online at www.mgoconnect.org
  • Official Site Survey indicating the property lines and proposed accessory building location with dimensions. Please include Impervious cover calculations 
  • Foundation Plans –If Accessory building is over 200 sq ft, an Engineered Foundation Plan  must be provided per City Ord# 15.03.110 Sec 401.1.2.
  • Construction drawings to include framing, dimensions, type of foundation, or indicate portable on skids***.

Permit Process:

  • Apply online at www.mgoconnect.org
  • Select Accessory Building in drop down box when applying
  • Upload supporting construction documents
  • Application accepted for review
  • Project # is assigned.  Click here for fee schedule 
  • Payment must be made in order to initiate plan review process
  • Allow ten (10) to fifteen (15) business days for review
  • Notification will be sent via e-mail from noreply@scpdc.org
  • Pay balance (if applicable)
  • Request required inspections – All inspections must be requested at www.mgoconnect.org by 3:00pm for the next business day

Required Inspections:

  • Set Back Inspection-Locate and Expose the Property Iron Pins and install a string line to form an outline of where accessory building is to be constructed/placed on property. If existing property pins cannot be located, the property boundary must be established by measurement from existing benchmarks or by placement of new property marks through a registered survey.**
  • Building Final Inspection – Property Iron Pins shall be left exposed for final inspection.

Please Note:

**The Owner/Contractor is responsible to properly locate the property lines; locate pins on survey, and assuring that the work is completed in compliance with applicable codes and ordinances. ***If a permanent foundation is proposed, pre-pour inspections will apply. ****If electrical or plumbing is part of project, additional permitting and inspections apply.

 


Common Questions:

Can I place a carport on my existing driveway?

Carport can be placed on existing driveway if it meets the required twenty-five foot (25ft) setback from property line.

Can I place a carport in the yard or on gravel? 

All parking must be on a an approved paved surface. A Paved Surface per Unified Development Code is an area surfaced with single or multiple-course surface treatment, asphalt, concrete, pervious concrete, or grasscrete pavement constructed on a base course or similar all-weather surface. Does not include gravel, grass, stones, decomposed granite, or similar unpaved materials. Also does not include existing concrete strip driveways allowed for residential parking areas called “Approved Surfaces” in Section 10.16.010 of the City Code.

Additional Engineering requirements may apply for pervious concrete, pavers, grasscrete, and other paved surface applications.

My property is in the downtown/old town overlay. Is there any special provisions I must meet? 

Please click here for more info regarding a Certificate of Appropriateness

 What is an official property survey? 

A property survey is a drawn record of the boundaries, orientation and easements associated with a lot of land.

What does an official property survey look like?

Click here for an example of a property survey

Where can I locate a copy of my property survey?

A survey is typically provided when you purchase a home and you should have been given a copy at your closing. Check with your closing documents and see if there is a copy in the paperwork and you already have it. If not contact the title company or your realtor. They should be able to either pull it from their files, or get it from the survey company for you.

Does the City of Georgetown have a copy of my survey?

To determine if the City of Georgetown does have a copy of your property survey, an open records request will have to be completed. The City of Georgetown has adopted the Texas State Library & Archives Commission retention schedule.

Does the Williamson County Clerk have a copy of my survey? 

No, the Williamson County Clerk’s office does not have copies of your property survey.

What is a plat?

A plat is the official map of an addition or subdivision, showing the number and dimensions of lots, public rights-of-way, and easements. The plat must be filed with the County Clerk after the City has approved it.

What is the difference between a plat and a property survey?

plat usually shows the dimensions of the property before the improvements are made. A plat will often cover more than one lot or parcel of land. For example, a developer will have a plat of an entire subdivision drawn; A survey usually only shows one lot.

Does the Williamson County Clerk have copies of subdivision plats? 

Yes, the Williamson County Clerk’s office does keep copies of the subdivision plats.

How do I search online for a copy of a subdivision plat? 

Please click here for directions to search for a subdivision plat

Does the Williamson County Appraisal District have a copy of my property survey? 

No, the Williamson County Appraisal District does not have copies of property surveys.

What is Impervious Cover? 

Per Chapter 16 of the Unified Development Code: Impervious Cover – Any hard-surfaced, man-made area that does not readily absorb or retain water, including, but not limited to, building roofs, parking and driveway areas, pavement, graveled areas, sidewalks, and paved recreation areas. Impervious Cover is subject to the determination of the Development Engineer. Includes and may be referred to as the term “Impervious Surface”.

Why is there Impervious Cover limitations? 

Per Chapter 11 of the Unified Development Code : Impervious cover limitations are adopted to minimize negative flooding effects from stormwater runoff and to control, minimize, and abate water pollution resulting from urban runoff of rainwater or other non-point specific sources, pursuant to Texas Water Code § 26.177

Where can I find more information on Impervious Cover Limitations?

Impervious Cover FAQ   or visit Chapter 11 of the Unified Development Code.

I live in the Old Town Overlay/Downtown Overlay, are there additional requirements?

If you live in the Old Town Overlay/Downtown Overlay a Certificate of Appropriateness may apply. For more info, please click here

MyGovernmentonline.org Instructions

Please click here for instructions to apply online

Additional information needed specific to your project?

Click here to submit an inquiry specific to your project

General Permitting Questions:

For any questions, please contact permits@georgetown.org

 

Trade Permits

Permitting Info:

Apply online at www.mgoconnect.org for the following Trade Permits:

  • Electrical Only*
  • Plumbing Only* **
  • Mechanical Only*

*For any electrical, plumbing, or mechanical trade permits, you must be a registered contractor. If you are the homeowner and plan do to the work yourself, then a Homeowners Exempt Form must be submitted along with your permit application.

**Plumbing, Electrical, and/or Mechanical Permits requested as part of new construction project must be requested under the main permit number for that particular new construction project.  Please contact general contractor for permit number.

Click here for directions to apply for a Trade Permit under a Main Project Permit Number

Once the permit is issued, you will receive notification to pay from no-reply@scpdc.org.


Requesting Inspections:

All inspections must be requested online through your www.mgoconnect.org account by 3:00 PM for next business days in most cases.

Inspections will be conducted Monday – Friday between the hours of 9:00 AM 2:00 PM for the following types of permits (or any inspections that require the homeowner to be present):

  • Water Heater
  • Mechanical Change Out
  • Solar Tubes/Attic Fans
  • Water Softener

For all other questions, please email permits@georgetown.org